Manchester Civil Justice Centre – Manchester

Cleaning out of boreholes, drilling boreholes deeper.

Access was extremely difficult, as the foundations for the building were under way, the drilling rig had to be lifted onto site using the tower crane.

Completion of extensive test pumping of the boreholes.

Installation of permanent pumping equipment.

Construction of various observation boreholes around the site 150mm diameter.

Installation of the permanent data logging instruments.