Mitzvah under construction Manchester

Borehole drilled with a finished diameter of 300mm to a depth of 120m, lined to 60m with plastic casing. The borehole was constructed exactly to a specification adapted to the Jewish faith. No steel or welding carried out on these works. The borehole to be used to supply bathing water during the relgious ceremonies.