Yorkshire Water – Barnoldswick

Removal of borehole pumps and line shaft pumps from 2no. wells 120mm diameter to 30m and boreholes 400mm diameter to 150metres, decommissioned to EA approval and provide decommissioning reports.

Crayfern Homes – Portsmouth

Decommissioning of heavily artesian borehole 550mm diameter to a depth of 50 metres to EA approval, and provide decommissioning report to allow continuation of house building project on the site of the ex-laundry.

Mr Pinnington – Wrexham

Borehole drilled to a finished diameter of 150mm to a depth of 60m. Water used for chicken rearing unit.

Mr Hockenhall – High Offley

Borehole drilled to a finished diameter of 150mm to a depth of 80m. Installation of permanent pumping equipment. Water used for dairy farm.

Mr Glover – Market Drayton

Borehole drilled to a finished diameter 150mm to a depth of 60m. Permanent pumping equipment installed. Water used for pig rearing unit.

Mrs Gregory – Telford

Borehole drilled to a finished diameter of 150mm to a depth of 60m. Permanent pumping equipment installed. Water used for general farming purposes.

Mr Bowman – Penrith

Finished diameter 250mm to a depth of 120m water used for general farming purposes. Permanent pumping equipment installed.

Mr Smith – Cockerham

Borehole drilled to a depth of 130m, 150mm diameter. Permanent pumping equipment installed. Borehole required for general farm use.

Manchester University Birley Fields

Drilling and extensive test pumping of three geothermal boreholes for Manchester University at the new Birley fields development. All three boreholes drilled to 450mm finished diameter using cable tool machines due to the close proximity to  domestic dwellings and shops around Manchester city centre. Test pumping carried out on each source for 7 day duration at rates of […]

Manchester University Business School

Drilling and extensive test pumping of three geothermal boreholes at the new Manchester business school development. Drilling of boreholes to a finished diameter of 300mm and to depths of 100m. Test pumping carried out at rates of 100m3/hour on all sources, including step testing and re-charge testing.

Princess St – Manchester

2no. 450mm diameter boreholes depth 90m each, extensive test pump and re-charge testing carried out on the boreholes. Site constraints were extremely difficult being a city centre site, adjacent to the canal, with limited space available to all contractors working on the site.