Yorkshire Water – Barnoldswick
Removal of borehole pumps and line shaft pumps from 2no. wells 120mm diameter to 30m and boreholes 400mm diameter to 150metres, decommissioned to EA approval and provide decommissioning reports.
Removal of borehole pumps and line shaft pumps from 2no. wells 120mm diameter to 30m and boreholes 400mm diameter to 150metres, decommissioned to EA approval and provide decommissioning reports.
Decommissioning of heavily artesian borehole 550mm diameter to a depth of 50 metres to EA approval, and provide decommissioning report to allow continuation of house building project on the site of the ex-laundry.
Locating of boreholes that supplied the GEC factory, decommissioning of 3no. 600mm diameters to 100m to EA approval, and provide decommissioning report to allow development of the site.
Borehole drilled to a finished diameter of 150mm to a depth of 60m. Water used for chicken rearing unit.
Borehole drilled to a finished diameter of 150mm to a depth of 80m. Installation of permanent pumping equipment. Water used for dairy farm.
Borehole drilled to a finished diameter 150mm to a depth of 60m. Permanent pumping equipment installed. Water used for pig rearing unit.
Borehole drilled to a finished diameter of 150mm to a depth of 60m. Permanent pumping equipment installed. Water used for general farming purposes.
Finished diameter 250mm to a depth of 120m water used for general farming purposes. Permanent pumping equipment installed.
Borehole drilled to a depth of 130m, 150mm diameter. Permanent pumping equipment installed. Borehole required for general farm use.
Drilling and extensive test pumping of three geothermal boreholes for Manchester University at the new Birley fields development. All three boreholes drilled to 450mm finished diameter using cable tool machines due to the close proximity to domestic dwellings and shops around Manchester city centre. Test pumping carried out on each source for 7 day duration at rates of […]
Drilling and extensive test pumping of three geothermal boreholes at the new Manchester business school development. Drilling of boreholes to a finished diameter of 300mm and to depths of 100m. Test pumping carried out at rates of 100m3/hour on all sources, including step testing and re-charge testing.
2no. 450mm diameter boreholes depth 90m each, extensive test pump and re-charge testing carried out on the boreholes. Site constraints were extremely difficult being a city centre site, adjacent to the canal, with limited space available to all contractors working on the site.