Racecourse Lancashire

Irrigation borehole finished diameter 300mm depth 100m.  Test pumping and abstraction licence application.

Large Shopping Complex Manchester

2no. boreholes drilled with a finished diameter 300mm depth 120m for irrigation of gardens. Installation of permanent pumping equipment and abstraction licence application.

Country Club & Hotel Cheshire

Finished diameter 250mm depth 80m for irrigation of golf course and lake top up. Installation of permanent pumping equipment, piping into existing storage tank. Abstraction licence application.

Country Club & Country Park Lanacashire

Borehole with finished diameter 250mm, to a depth 120m for irrigation of golf course. Test pumping on the borehole, permanent pumping equipment and abstraction licence application.

Artesian Water Supply Borehole United Utilities

August 2013 – Drilling of the abstraction borehole for United Utilities. The borehole was required in order to serve as the pumping well in the enabling works for other site operations.   Drilling started off with 1400mm diameter to ensure that the borehole could be advanced through the overburden and peet layer expected at approximately […]

Network Rail – Mersey Loop Drainage Tunnel Scheme Wilo-Emu Pump Installation

After all these years, we are still carrying out works on the abstraction boreholes on the Mersey Loop Drainage Tunnel, now under Network Rail. 2013 has seen ourselves have to become Link-Up Verified with the Achilles system to enable ourselves to continue to carry out works on the Network Rail system. The pass which was achieved […]