Premier League Football Club London – Home Ground
Irrigation borehole finished diameter 250mm depth 150m, permanent pumping equipment and pipe work infrastructure around the stadium.
Irrigation borehole finished diameter 250mm depth 150m, permanent pumping equipment and pipe work infrastructure around the stadium.
Irrigation borehole finished diameter 250mm depth 150m, permanent pumping equipment and storage tank and pipe work.
Irrigation borehole finished diameter 300mm depth 80m, all associated permanent pumping equipment, abstraction licence application
3no. irrigation boreholes finished diameter 300mm depths 80 – 120m, all permanent pumping equipment and associated licence applications
Irrigation borehole finished diameter 300mm depth 100m. Test pumping and abstraction licence application.
2no. boreholes drilled with a finished diameter 300mm depth 120m for irrigation of gardens. Installation of permanent pumping equipment and abstraction licence application.
Finished diameter 250mm depth 80m for irrigation of golf course and lake top up. Installation of permanent pumping equipment, piping into existing storage tank. Abstraction licence application.
Borehole with finished diameter 250mm, to a depth 120m for irrigation of golf course. Test pumping on the borehole, permanent pumping equipment and abstraction licence application.
Borehole finished diameter 350mm to 60m, installation of permanent pumping equipment. Borehole for irrigation of garden areas and fountains in city centre location.
Irrigation borehole finished diameter 300mm depth 100m, installation of permanent pumping equipment, head works, and abstraction licence application.
August 2013 – Drilling of the abstraction borehole for United Utilities. The borehole was required in order to serve as the pumping well in the enabling works for other site operations. Drilling started off with 1400mm diameter to ensure that the borehole could be advanced through the overburden and peet layer expected at approximately […]
After all these years, we are still carrying out works on the abstraction boreholes on the Mersey Loop Drainage Tunnel, now under Network Rail. 2013 has seen ourselves have to become Link-Up Verified with the Achilles system to enable ourselves to continue to carry out works on the Network Rail system. The pass which was achieved […]